Detailed planning and inventory optimization model in the mattress industry
In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where...
Guardado en:
| Autores principales: | , , , |
|---|---|
| Formato: | Documento de conferencia acceptedVersion docunento de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2018
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/20.500.12272/3101 |
| Aporte de: |
| id |
I68-R174-20.500.12272-3101 |
|---|---|
| record_format |
dspace |
| spelling |
I68-R174-20.500.12272-31012023-06-28T22:49:07Z Detailed planning and inventory optimization model in the mattress industry Montagna, Jorge Marcelo Cecchietti, Aldo Rodriguez, María Analía Corsano, Gabriela Production planning Inventory management Polyurethane foam MILP In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance. VIII CAIQ 2015 AAIQ Buenos Aires y 3 JASP Fil: IDTQ-PLAPIQUI (CONICET-UNC), Av. Vélez Sarsfield 1611, Ciudad Universitaria, X5016GCA, Córdoba, Argentina Fil: INGAR (CONICET-UTN), Avellaneda 3657, Santa Fe 3000, Argentina Peer Reviewed 2018-09-10T17:46:10Z 2018-09-10T17:46:10Z 2015 info:eu-repo/semantics/conferenceObject info:eu-repo/semantics/acceptedVersion docunento de conferencia http://hdl.handle.net/20.500.12272/3101 eng “Integración de sistemas soporte de decisión para la gestión optima de la cadena de suministros utilizando sistemas empresariales” Código:25/0152 Fumero, Y.; Corsano, G.; Montagna, J. M. (2011). Planning and Scheduling of Multistage Multiproduct Batch Plants Operating under Production Campaigns. Ann. Oper. Res., 199, 249–268. Fumero, Y.; Corsano, G.; Montagna, J. M. (2013). Integrated Modeling Framework for Supply Chain Design Considering Multiproduct Production Facilities. Ind. Eng. Chem. Res., 52, 16247–16266. Grossmann, I. E. (2012). Advances in Mathematical Programming Models for Enterprise-Wide Optimization. Comput. Chem. Eng., 47, 2–18. Lin, B. M. T.; Lin, Y.-Y.; Fang, K.-T. (2013). Two-Machine Flow Shop Scheduling of Polyurethane Foam Production. Int. J. Prod. Econ., 141, 286–294. Maravelias, C. T.; Sung, C. (2009). Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities. Comput. Chem. Eng., 33, 1919–1930. Marchetti, P. A.; Gupta, V.; Grossmann, I. E.; Cook, L.; Valton, P.-M.; Singh, T.; Li, T.; André, J. (2014). Simultaneous Production and Distribution of Industrial Gas Supply-Chains. Comput. Chem. Eng., 69, 39–58. Mogaji, P. B. A (2014). Decision Support System for Process Planning and Control of Polyurethane Foam Production http://www.scitechnol.com/a-decision-support-system-for-process-planning-and-control-of-polyurethane-foam-production-fd2A.pdf (accessed Aug 20, 2014). Relvas, S.; Boschetto Magatão, S. N.; Barbosa-Póvoa, A. P. F. D.; Neves, F. (2013). Integrated Scheduling and Inventory Management of an Oil Products Distribution System. Omega, 41, 955–968. Rodriguez, M. A.; Vecchietti, A. (2010). Inventory and Delivery Optimization under Seasonal Demand in the Supply Chain. Comput. Chem. Eng., 34, 1705–1718 Rosenthal, R.E. (2013). GAMS- A User's Guide. GAMS Development Corporation, Washington, DC, USA. info:eu-repo/semantics/openAccess http://creativecommons.org/publicdomain/zero/1.0/ autorizo la publicación de la obra desde su aprobación/presentación CC0 1.0 Universal application/pdf |
| institution |
Universidad Tecnológica Nacional |
| institution_str |
I-68 |
| repository_str |
R-174 |
| collection |
RIA - Repositorio Institucional Abierto (UTN) |
| language |
Inglés |
| topic |
Production planning Inventory management Polyurethane foam MILP |
| spellingShingle |
Production planning Inventory management Polyurethane foam MILP Montagna, Jorge Marcelo Cecchietti, Aldo Rodriguez, María Analía Corsano, Gabriela Detailed planning and inventory optimization model in the mattress industry |
| topic_facet |
Production planning Inventory management Polyurethane foam MILP |
| description |
In this work, a mixed integer linear programming (MILP) model for the simultaneous production and inventory planning problems is proposed, which arise in the industrial context of polyurethane foam manufactory. The production process considers the foam blooming stage as well as the curing step where the blocks are dried. Several tradeoffs are involved in the overall model given that detailed inventory management decisions are also taken into account in the formulation. Several study cases provided by a local company are tested to show the model performance. |
| format |
Documento de conferencia acceptedVersion docunento de conferencia |
| author |
Montagna, Jorge Marcelo Cecchietti, Aldo Rodriguez, María Analía Corsano, Gabriela |
| author_facet |
Montagna, Jorge Marcelo Cecchietti, Aldo Rodriguez, María Analía Corsano, Gabriela |
| author_sort |
Montagna, Jorge Marcelo |
| title |
Detailed planning and inventory optimization model in the mattress industry |
| title_short |
Detailed planning and inventory optimization model in the mattress industry |
| title_full |
Detailed planning and inventory optimization model in the mattress industry |
| title_fullStr |
Detailed planning and inventory optimization model in the mattress industry |
| title_full_unstemmed |
Detailed planning and inventory optimization model in the mattress industry |
| title_sort |
detailed planning and inventory optimization model in the mattress industry |
| publishDate |
2018 |
| url |
http://hdl.handle.net/20.500.12272/3101 |
| work_keys_str_mv |
AT montagnajorgemarcelo detailedplanningandinventoryoptimizationmodelinthemattressindustry AT cecchiettialdo detailedplanningandinventoryoptimizationmodelinthemattressindustry AT rodriguezmariaanalia detailedplanningandinventoryoptimizationmodelinthemattressindustry AT corsanogabriela detailedplanningandinventoryoptimizationmodelinthemattressindustry |
| _version_ |
1770623466126442496 |