Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests

"In this paper, the common-mode to differential mode conversion in a Bulk Current Injection (BCI) test setup is analyzed in the presence of an optical fiber transmitter. A modular-basis analysis based on S-parameters measurements and Electromagnetic simulations has been performed. It is shown t...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Gardella, Pablo, Mariani, Eduardo
Formato: Ponencias en Congresos acceptedVersion
Lenguaje:Inglés
Publicado: 2022
Materias:
Acceso en línea:http://ri.itba.edu.ar/handle/123456789/3894
Aporte de:
id I32-R138-123456789-3894
record_format dspace
institution Instituto Tecnológico de Buenos Aires (ITBA)
institution_str I-32
repository_str R-138
collection Repositorio Institucional Instituto Tecnológico de Buenos Aires (ITBA)
language Inglés
topic CONVERTIDORES ANALOGICO-DIGITALES
spellingShingle CONVERTIDORES ANALOGICO-DIGITALES
Gardella, Pablo
Mariani, Eduardo
Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
topic_facet CONVERTIDORES ANALOGICO-DIGITALES
description "In this paper, the common-mode to differential mode conversion in a Bulk Current Injection (BCI) test setup is analyzed in the presence of an optical fiber transmitter. A modular-basis analysis based on S-parameters measurements and Electromagnetic simulations has been performed. It is shown that the loading effects can change the insertion losses from the RF amplifier to the Devices Under Test, even at frequencies as low as 10MHz by 2dB and up to 23dB at worst cases. The study has been undertaken with the substitution and closed-loop methods. Quantification of this problem as well as mitigation strategies are proposed, analyzed and evaluated with the aim of improving the accuracy of BCI simulations at early-design stages. Considering the significant cost of redesigning at an advanced point in the product development cycle, the presented work expects to raise awareness about how even small changes in the BCI setup can remarkably compromise the outcome."
format Ponencias en Congresos
acceptedVersion
author Gardella, Pablo
Mariani, Eduardo
author_facet Gardella, Pablo
Mariani, Eduardo
author_sort Gardella, Pablo
title Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
title_short Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
title_full Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
title_fullStr Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
title_full_unstemmed Analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
title_sort analysis of the impact of the monitoring equipment on the common-mode to differential-mode conversion in bulk current injection tests
publishDate 2022
url http://ri.itba.edu.ar/handle/123456789/3894
work_keys_str_mv AT gardellapablo analysisoftheimpactofthemonitoringequipmentonthecommonmodetodifferentialmodeconversioninbulkcurrentinjectiontests
AT marianieduardo analysisoftheimpactofthemonitoringequipmentonthecommonmodetodifferentialmodeconversioninbulkcurrentinjectiontests
bdutipo_str Repositorios
_version_ 1764820523524554754