Method of statistical control of the supply reliability

In Buenos Aires metropolitan area, electrical energy distribution must comply with maximum supply interruption rates, imposed on distributors by Franchise Agreements. The calculation procedure of the corresponding discounts (bonus) includes the record of network contingencies, type of customer-netw...

Descripción completa

Detalles Bibliográficos
Autores principales: Issouribehere, Pedro, Barbero, Juan Carlos, Martínez, Jorge Luis, Galinski, Alejandro
Formato: Objeto de conferencia
Lenguaje:Inglés
Publicado: 2001
Materias:
Acceso en línea:http://sedici.unlp.edu.ar/handle/10915/36850
Aporte de:
id I19-R120-10915-36850
record_format dspace
institution Universidad Nacional de La Plata
institution_str I-19
repository_str R-120
collection SEDICI (UNLP)
language Inglés
topic Ingeniería
Electrotecnia
industria eléctrica
Energía Eléctrica
power quality
long term interruption
control
statistics
spellingShingle Ingeniería
Electrotecnia
industria eléctrica
Energía Eléctrica
power quality
long term interruption
control
statistics
Issouribehere, Pedro
Barbero, Juan Carlos
Martínez, Jorge Luis
Galinski, Alejandro
Method of statistical control of the supply reliability
topic_facet Ingeniería
Electrotecnia
industria eléctrica
Energía Eléctrica
power quality
long term interruption
control
statistics
description In Buenos Aires metropolitan area, electrical energy distribution must comply with maximum supply interruption rates, imposed on distributors by Franchise Agreements. The calculation procedure of the corresponding discounts (bonus) includes the record of network contingencies, type of customer-network connection and non-supplied energy estimation. The control method which is described, comprises the record of interruptions at supply points and the following calculation of the corresponding bonus. By selecting these points with statistical sampling criteria, it is possible to determine the quality of the Utility global task performed by traditional methods. This method is similar to that one used to control electrical energy meters in service. The present starting-up stage of the method provides deterministic information about long term interruptions obtained from records of supply interruptions, carried out for about three years of systematic recording. Also recorded short interruptions (durations comprised between 10 sec. and 3 minutes) are analyzed. At present, these short interruptions are not penalized by the Argentine regulation, but this topic has increasing importance to qualify supply reliability to industries.
format Objeto de conferencia
Objeto de conferencia
author Issouribehere, Pedro
Barbero, Juan Carlos
Martínez, Jorge Luis
Galinski, Alejandro
author_facet Issouribehere, Pedro
Barbero, Juan Carlos
Martínez, Jorge Luis
Galinski, Alejandro
author_sort Issouribehere, Pedro
title Method of statistical control of the supply reliability
title_short Method of statistical control of the supply reliability
title_full Method of statistical control of the supply reliability
title_fullStr Method of statistical control of the supply reliability
title_full_unstemmed Method of statistical control of the supply reliability
title_sort method of statistical control of the supply reliability
publishDate 2001
url http://sedici.unlp.edu.ar/handle/10915/36850
work_keys_str_mv AT issouribeherepedro methodofstatisticalcontrolofthesupplyreliability
AT barberojuancarlos methodofstatisticalcontrolofthesupplyreliability
AT martinezjorgeluis methodofstatisticalcontrolofthesupplyreliability
AT galinskialejandro methodofstatisticalcontrolofthesupplyreliability
bdutipo_str Repositorios
_version_ 1764820472274354180