|
|
|
|
| LEADER |
01761nam a22003015a 4500 |
| 001 |
19567 |
| 003 |
AR-SrUBC |
| 005 |
20210617144915.0 |
| 007 |
t||||||||||||| |
| 008 |
990606m||||||||maua||||r|||||||||||eng|| |
| 020 |
|
|
|a 0201546647
|
| 040 |
|
|
|a AR-SrUBC
|b eng
|e rcaa2
|
| 080 |
|
|
|a 519.681=20
|2 3a Abr ES
|
| 245 |
1 |
4 |
|a The CAPABILITY maturity model :
|b guidelines for improving the software process /
|c principal contributors and editors Mark C. Paulk ... [et al.] ; other contributors Edward L. Averill ... [et al.].
|
| 260 |
|
|
|a Reading, Mass. :
|b Addison-Wesley,
|c 1998.
|
| 300 |
|
|
|a 441 p. :
|b il. ;
|c 24 cm.
|
| 336 |
|
|
|a texto
|2 rdacontent
|
| 337 |
|
|
|a sin mediación
|2 rdamedia
|
| 338 |
|
|
|a volumen
|2 rdacarrier
|
| 490 |
|
0 |
|a SEI series in software engineering
|
| 505 |
0 |
0 |
|a Contenido: Introducing software process maturity. The software process maturity framework. The structure of the capability maturity model. Interpreting the CMM. Using the CMM. A high-maturity example: space shuttle onboard software. The key areas for level 2: repeatable. The key process areas for level 3: defined. The key process areas for level 4: managed. The key process areas for level 5: optimizing. Apendixes: Abridged version of the key practices. Mapping the key practices to goals. Comparing ISO 9001 and the CMM. An overview of ISO's SPICE project. Change history of the CMM. Change request from.
|
| 650 |
|
7 |
|a PROGRAMACION (COMPUTADORES ELECTRONICOS)
|2 lemb2
|9 2109
|
| 700 |
1 |
|
|a Paulk, Mark C.
|9 37747
|
| 700 |
1 |
|
|a Weber, Charles V.
|9 37748
|
| 700 |
1 |
|
|a Curtis, Bill
|9 37749
|
| 710 |
2 |
|
|a Carnegie Mellon University.
|b Software Engineering Institute.
|9 37750
|
| 942 |
|
|
|2 cdu
|b 1999-06-06
|c BK
|d 020715
|h 519.681=20
|i CAPp
|z CT
|6 51968120_CAPP
|
| 999 |
|
|
|c 19567
|d 19567
|