|
|
|
|
| LEADER |
03603cam#a22003013a#4500 |
| 001 |
INGM-MON-00545 |
| 003 |
AR-LpUFI |
| 005 |
20220927094016.0 |
| 008 |
060510s1974 |||a fr||||| |0 0|eng d |
| 080 |
|
|
|a 621.31 ASC
|
| 245 |
0 |
0 |
|a Electric power and the civil engineer
|
| 260 |
|
|
|a New York :
|b ASCE,
|c 1974.
|
| 300 |
|
|
|a 676 p.
|
| 505 |
0 |
|
|a Logical approach to structural design of nuclear plants; Koppe. R. E.;The past and present of structural design of nuclear power plants; Slotterback. J. R.;Tornado missile barrier for nuclear power plants; Jankov. Z.;Seismic analysis and design of the San Onofre units 2 and PWR containment; Wiley. J. W.;A commentary on the design and analysis of the steel containment elements of a steel mark III containment vessel; Baker. R. C.;Introduction to the ASCE task force report on the design and construction of steel chimney liners; Mikitka. R. W.;Dynamic response of steel chimney liners to flue gas flow; Deans. J. J.;Dynamic response of chimney liners to wind and earthquake; Abu-Sitta. S. H.;Dynamic behavior of steel liners; Domer. R. G.;Modeling gas mixing and heat transfer within steel chimney liners; Markowsky. J. J.;Thermal behavior of a 1000-foot steel chimney liner; Fortey. J. W.;Thermal loads and resultant stresses in ring girders and stiffeners due to flue gas temperature transients; Blackman. J.;Entrainment and entrapment of fish at electric power generating stataions on the great lakes; Edsall. Thomas A.;Pumped entrainment-stresses. Impact and potential solutions; Waller. William T.;Vulnerability and survival of young fishes entrained at water intakes; Marcy. Barton C.;Power plants and estuaries-ecological implications and design objectives; Miller. Don C.;Flume testing as a device for national intake screen design; Mayo. Ronald D.;Aquatic studies at the Ludington Pumped storage project on lake Michigan; Reynolds. John Z.;Economic analysis of the bath county project; Hagood. James M.;Bad creek pumped-storage project; Hester. J. G.;The james bay energy development; Amyot. Paul;Mount hope project-studies of an underground site for developing peaking capacity; Richert. Robert C.;Design and construction features of a 800 MW fossil power station; Guha-Biswas. S.;Analysis and design of hyperbolic cooling towers; Gupta. A. K.;Gust load factors for cooling towers; Abu-Sitta. S. H.;Sediment and effluent control for fossil power plants; Grau. H. C.;Response of suspended boilers to earthquake motions; Anderson. J. C.;Ground water-it´s role in the operation of turkey point power plant; Knowles. P. C.;Model testing of circulating water pump screenwell structures; Colon. Frazier P.;Navajo generating station-lake pumping station; Gaughan. W. F.;Design of the 700 megawatt francis turbines to be installed at the third powerhouse at grand coulee; Meyers. J. F.;Antilon lake pumped-storage project; Williamson. James V.;Soil-structure interaction problems for nuclear containment structures; Kausel. E.;Soil-structure interaction-20 vs. 3D finite element; Chu. S. L.
|
| 599 |
|
|
|a Ubic.:621.31 ASC Ej.1 PRES DON Observ.MORETTO
|
| 650 |
1 |
4 |
|a ENERGIA ELECTRICA
|9 266842
|
| 650 |
1 |
4 |
|a ENERGIA NUCLEAR
|9 265425
|
| 650 |
1 |
4 |
|a PETROLEO
|9 262874
|
| 650 |
1 |
4 |
|a ENERGIA HIDRAULICA
|9 265696
|
| 710 |
0 |
|
|a ASCE. Power Division
|9 313654
|
| 711 |
0 |
|
|a Specially Conference (1974 aug. 12-14 : Boulder, Colorado)
|9 313655
|
| 929 |
|
|
|a C8700 Ubic.:621.31 ASC Ej.1 PRES DON Observ.MORETTO
|
| 942 |
|
|
|c CON
|6 _
|
| 959 |
|
|
|a MON
|
| 960 |
|
|
|a 20389
|
| 970 |
|
|
|a Registro convertido en forma automatizada
|
| 990 |
|
|
|a GBY
|
| 999 |
|
|
|c 23577
|d 23577
|