|
|
|
|
| LEADER |
00982nam a22003370a 4500 |
| 001 |
PT6338 |
| 003 |
AR-LpoUNG |
| 005 |
20210131232144.0 |
| 008 |
191001s1982||||xxu|||||||||||||||||eng d |
| 040 |
|
|
|a AR-LpoUNG
|b spa
|c AR-LpoUNG
|e aacr
|
| 041 |
|
|
|a eng
|
| 044 |
|
|
|a xxu
|
| 082 |
0 |
|
|a 711.12 769des
|
| 100 |
1 |
|
|a Cooper, Lauren E.
|
| 245 |
1 |
0 |
|a Designing the site and service plot allocation process :
|b lessons from project experience
|
| 260 |
|
|
|a Washington, D. C. :
|b Banco Mundial,
|c 1982.
|
| 300 |
|
|
|a 30 p. :
|b gráfs.
|
| 650 |
|
4 |
|a INFRAESTRUCTURA FISICA
|
| 650 |
|
4 |
|a OBRAS PUBLICAS
|
| 650 |
|
4 |
|a PARCELACION DE LA TIERRA
|
| 650 |
|
4 |
|a PLANES DE DESARROLLO
|
| 650 |
|
4 |
|a PLANIFICACION URBANA
|
| 650 |
|
4 |
|a PROYECTOS DE DESARROLLO
|
| 650 |
|
4 |
|a URBANISMO
|
| 650 |
|
4 |
|a USO DE LA TIERRA
|
| 650 |
|
4 |
|a VIVIENDA
|
| 651 |
|
4 |
|a DOCUMENTOS TEORICOS O METODOLOGICOS
|
| 710 |
2 |
|
|a Banco Mundial (Washington, D.C.)
|
| 905 |
|
|
|a 6338
|
| 942 |
|
|
|c LIB
|
| 999 |
|
|
|c 14062
|d 14062
|