|
|
|
|
| LEADER |
00678nam a2200229 4500 |
| 001 |
002869 |
| 003 |
arbauncb |
| 005 |
20230320150054.0 |
| 008 |
190606s1982 ag g 000 0 spa d |
| 999 |
|
|
|c 56209
|d 56209
|
| 040 |
|
|
|a AR-BaUNCB
|c AR-BaUNCB
|
| 082 |
0 |
4 |
|a 625
|
| 100 |
1 |
|
|a Corvalán, Juan Manuel
|9 4674
|
| 245 |
1 |
0 |
|a Programación de obras y proyectos por el método P.E.R.T. :
|b critical path method. /
|c Juan Manuel Corvalán
|
| 260 |
|
|
|a La PLata :
|b CEILP,
|c 1982.
|
| 300 |
|
|
|a 16 p. :
|b il. ;
|c 28 cm.
|
| 650 |
|
7 |
|a Proyectos
|2 spines
|
| 650 |
|
7 |
|a Análisis de redes
|2 unescot
|
| 650 |
|
7 |
|a Carreteras
|2 spines
|
| 653 |
|
|
|a Obras
|
| 653 |
|
|
|a Programación
|
| 942 |
|
|
|2 ddc
|c UNICO
|