|
|
|
|
LEADER |
00973nam a22002295a 4500 |
001 |
197 |
003 |
AR-SjUIP |
005 |
20200306111456.0 |
008 |
931123t1982 |||a 00 0 eng d |
040 |
|
|
|a AR-SjUIP
|c AR-SjUIP
|
900 |
|
|
|a Proyecto Huarpe
|b 6699
|c 6699
|d Proyecto Huarpe
|
245 |
1 |
0 |
|a Groundwater control in tunneling /
|c prepared by U.S. Department of Transportation, Federal Highway Adminstration.
|
260 |
|
|
|a Washington, DC. :
|b the Department,
|c 1982.
|
500 |
|
|
|a Incluye Bibliografía.
|
500 |
|
|
|a La Biblioteca de la fac. de Ingeniería posee: v.2.: Preventing groundwater intrusion into completed transportation tunnels. Report N§ FRWA-RD-81-074. v.3.: Recommended practice. Report N§ FHWA-RD-81-075.
|
080 |
|
|
|a 624.19:624.131.7
|2 6 abrev. esp.
|
650 |
|
7 |
|
110 |
|
|
|a Estados Unidos.
|b Department of Transportation Federl Highway Administration
|9 200508
|
300 |
|
|
|a v. :
|b il. ;
|c 28 cm.
|
504 |
|
|
|
942 |
|
|
|2 udc
|c LIB
|
999 |
|
|
|c 146919
|d 146919
|