An effective continuous-time formulation for scheduling optimization in a shipbuilding assembly process
This work aims at finding an optimal solution of assembly operations in a system of multi-stage production in a shipyard. Shipbuilding of large-size ships is a complex manufacturing process involving the production and assem-bly of a big quantity of blocks. These blocks are then assembled on the blo...
Guardado en:
| Autores principales: | Basán, Natalia P., Achkar, Virginia G., Garcia del Valle, Alejandro, Méndez, Carlos A. |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2017
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/66216 |
| Aporte de: |
Ejemplares similares
-
An Efficient MILP-Based Decomposition Strategy for Solving Large-Scale Scheduling Problems
por: Basán, Natalia P., et al.
Publicado: (2019) -
An iterative solution approach for truck routing and scheduling in the forest industry
por: Bordón, Maximiliano, et al.
Publicado: (2018) -
Scheduling of flexible manufacturing plants with redesign options : a MILP-based decomposition algorithm and case studies
por: Basán, Natalia P., et al.
Publicado: (2021) -
Improving the mathematical formulation for the detailed scheduling of refined products pipelines by acconting for flow rate dependent pumping costs
por: Cafaro, Vanina G., et al.
Publicado: (2013) -
Production scheduling optimization for power-intensive processes with time-sensitive electricity prices
por: Basán, Natalia, et al.
Publicado: (2016)