Production scheduling optimization for power-intensive processes with time-sensitive electricity prices
Continuous power-intensive processes in air separation plant can take advantage of optimal production planning to reduce the consumption of electricity. In this work a solution approach is developed based on a discrete-time scheduling formulation that allows modeling and optimizing operating decisi...
Guardado en:
| Autores principales: | Basán, Natalia, Méndez, Carlos A. |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2016
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/58392 http://45jaiio.sadio.org.ar/sites/default/files/1577-4988-1-DR_0.pdf |
| Aporte de: |
Ejemplares similares
-
An effective continuous-time formulation for scheduling optimization in a shipbuilding assembly process
por: Basán, Natalia P., et al.
Publicado: (2017) -
A novel framework for integrating real-time optimization and optimal scheduling : Application to heat and power systems
por: Serralunga, Fernán J., et al.
Publicado: (2014) -
Multiobjetive optimization co-evolution for the job shop scheduling problem
por: Esquivel, Susana Cecilia, et al.
Publicado: (1999) -
A performance comparison of data-aware heuristics for scheduling jobs in mobile Grids
por: Hirsch, Matías, et al.
Publicado: (2017) -
Metaheuristics for production scheduling
Publicado: (2013)