Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
Since 1997 Utilities in Argentina have been required by the Regulatory Authority (Ente Nacional Regulador de la Electricidad - ENRE) to carry out severe monitoring programs. These monitoring programs involve measuring both voltage level and disturbances - harmonics and flicker - in different points...
Guardado en:
| Autores principales: | Issouribehere, Pedro, Barbera, Gustavo Ariel |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2005
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/44675 https://app.box.com/s/zmrxj95olbs4ltsqks0kmk1oxrz5hr4z |
| Aporte de: |
Ejemplares similares
-
Estudio de factibilidad para la provisión de energía eléctrica a un consumidor rural aislado
por: Cocconi, Gustavo, et al.
Publicado: (1987) -
Accesos a GBA a largo plazo : Alternativas de abastecimiento 2033
por: Beroqui, Mario César, et al.
Publicado: (2013) -
Experiencias en el control de armónicas y "flicker" en servicios eléctricos públicos
por: Issouribehere, Pedro, et al.
Publicado: (1999) -
Línea aérea de alta tensión SSEE Morón-San Miguel
por: Soloaga, Héctor Rodolfo
Publicado: (1991) -
Ensayos de comisionado en transformadores tipo GSU
por: Calo, Emilio
Publicado: (2016)