Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants
In this paper several models proposed for Excitation Control Systems, Synchronous Machines, Prime Movers Control System and Turbines corresponding to the Hydraulic power plants of Colbún and Machicura are shown and verified. These power plants are located in the “Interconnected Central System” (SIC...
Guardado en:
| Autores principales: | Agüero, Jorge Luis, Bastidas Almarza, L., Beroqui, Mario César, Fuentes Bomvin, S. |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Español |
| Publicado: |
2005
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/36734 |
| Aporte de: |
Ejemplares similares
-
Hydraulic transients in hydropower plant : Impact on power system dynamic stability
por: Agüero, Jorge Luis, et al.
Publicado: (2008) -
Hydropower plant models: water supply system, turbine and governor : Model validation: on site tests and grid fault simulation
por: Agüero, Jorge Luis, et al.
Publicado: (2007) -
Hydraulic turbines : their design and installation /
por: Gelpke, Viktor
Publicado: (1911) -
Emergency gate closing in a Kaplan turbine intake for runaway condition: CFD transient study for two-phase flow and experimental validation
por: Rivetti, Arturo, et al.
Publicado: (2021) -
Gas turbine control : Modifications for: availability and limitation of spinning reserve and limitation of non-desired unloading
por: Agüero, Jorge Luis, et al.
Publicado: (2005)