A weight-based algorithm to deal with due dates in flexible package production scheduling
This paper is an extension of a previous paper published in [2]. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, f...
Guardado en:
| Autores principales: | Ibáñez, Francisco S., Diaz, Daniel, Forradellas, Raymundo Quilez, Zavalla, Germán |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2004
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/22545 |
| Aporte de: |
Ejemplares similares
-
An algorithm to deal with due date violation in a multi-objective scheduling problem
por: Ibáñez, Francisco S., et al.
Publicado: (2003) -
An algorithm for minimising due times violations in flexible package production scheduling
por: Ibáñez, Francisco S., et al.
Publicado: (2003) -
An approach to solve scheduling problems with atrributes assoaciated to the activities
por: Ibáñez, Francisco S., et al.
Publicado: (2001) -
Studs and immigrants in multirecombined evolutionary algorithm to face weighted tardiness scheduling problems
por: Pandolfi, Daniel, et al.
Publicado: (2001) -
Programación con restricciones en problemas de scheduling: planificación de actividades y recursos de producción
por: Ibáñez, Francisco S., et al.
Publicado: (1999)